Internal audit on the same graph, behind its own wall.

The audit universe lives in a spreadsheet that has drifted from the control library, and the workpapers sit on a shared drive. Zovos puts the universe, the plan, the engagements and the workpapers on the same graph as the controls they test, behind a wall the auditee cannot see past.

ForInternal audit
SurfacesUniverse & plan · Engagements · Workpapers · Findings
Today · 01

How it runs today.

You build the annual plan from last year’s universe and reconcile it against the current control list by hand. During fieldwork you send PBC requests by email and save workpapers to a drive with no link to the controls they test. The week after fieldwork goes to drafting findings and the risk-and-control matrix.

Where it breaks · 02

Where it breaks.

Keeping audit in its own spreadsheets and drives protects independence, and that is why many teams do it. The cost is the link, because coverage and workpapers no longer touch the controls being audited. Can audit share the graph without giving up its independence?

  • 01The audit universe is a spreadsheet that drifted away from the control library years ago.
  • 02Workpapers sit on a shared drive with no link to the controls they test.
  • 03Drafting the findings and the risk-and-control matrix eats the week after fieldwork.
The Zovos way · 03

Five steps, one graph.

Zovos puts audit on the same graph and enforces independence in the product. Auditees see only their own requests, and an internal-audit principal cannot approve a decision it may later audit.

  1. 01 · Plan

    The universe and plan sit on the control graph.

    Build the audit universe and the annual plan on the same graph as the controls, risks, and programs they cover, so coverage is derived instead of kept in a parallel spreadsheet.

  2. 02 · Request

    Auditees see only their own requests.

    Send PBC audit requests to auditees. They see only the requests addressed to them and their own management responses, never the workspace, plan, or workpapers.

  3. 03 · Fieldwork

    Workpapers link to the controls they test.

    Work each engagement in one workbench, with workpapers linked to the controls being audited and aligned to IIA GIAS 2024.

  4. 04 · Draft

    Agents draft, and the auditor signs.

    Workpaper, finding, and RCM drafters do the first pass, proposing findings, root causes, and control mappings. The auditor reviews and signs every draft.

  5. 05 · Report

    Sign-off independence is enforced.

    Findings flow into the governed findings queue for remediation. Sign-off independence is enforced, so an internal-audit principal cannot approve a decision it may later audit.

What changes · 04

What the product does instead.

Coverage
The annual plan shows coverage derived from the real control and risk estate.
Independence
It is enforced at sign-off and by the wall, not by policy alone.
Drafting
Agents draft workpapers, findings, and the RCM. An auditor signs.
Standards
Engagements map to IIA GIAS 2024, one of the 64 frameworks in the corpus.

Want to see this on your library?